Purpose/Scope:
- Visualize and Measure current material flow
- Recommend relayout changes to smooth flow & reduce distance traveled
Results in 1 week:
- Material flow for the top 9 products were documented, modeled, and analyzed.
- 3 relayout changes were created.
- New layout reduced annual flow by 2.8 million meters / 3.1 million yards